GEOHAZARD STUDIES

The Geological Hazard Studies Are Carried out According To The Requirement of The Saudi Geological Survey Following The International And Local Standards And Specifications Such As Those Given by The American Geological Survey, Geological Society of London And International Association of Natural Hazards .

  1. Sand dunes hazards along the coast between Al-Lith and Qunfudah, west of Saudi Arabia, 1994.
  2. Flooding hazards for the Holy Shrine Area, Makkah Region western Saudi Arabia.1995.
  3. Flooding hazards for areas between Al-Lith and Qunfudah, west of Saudi Arabia, 1995.
  4. Geohazards assessment of sand dunes between Jeddah and AL-Lith,1995.
  5. Earth fissuring and land subsidence at Western Saudi Arabia,1995.
  6. Stability analysis of rock cuts and slopes along Alhada Road, Taif, Western Saudi Arabia,1996.
  7. Rock mass stabilization for King Abdulaziz Road project, Makkah City, Urban Development Office,1997.
  8. Rock mass stabilization along King Khalid Road, Mina Holy Shrine Makkah City (Rio Company – Ministry of Public Works and Housing), 2002.
  9. Rock mass supporting system of King Khalid Tunnel Project, Mina Holy Shrine Makkah City (Rio Company – Ministry of Public Works and Housing) 2003
  10. Rock mass stabilization of isolated and unstable rocks of mountains surrounding Mina area, (Rio Company – Ministry of Public Works and Housing), 2003.
  11. Rock mass stabilization and reinforcement of rock cuts at Jabal Omar project, Makkah City (Rio Company – Jabal Omar Development Company),2003.
  12. Rock mass stabilization project for rock cuts stability for Road No.9 between Muzdalifa and Mina Hairy Makkah City,2003.
  13. Rock cuts stabilization for Ajyad New Hospital project, Makkah City, Public Investment Fund Ministry of Finance under the supervision of the Geological Survey,2003.
  14. Stability analysis of rock cuts along the Third Ring Road, Makkah City, (Rio Company – Ministry of Transport),2006.
  15. Support System assessments of the Third Ring Road Tunnel Makkah City (Rio Company – Ministry of Transport),2007.
  16. Rock mass stabilization analysis of the proposed rock cuts at Jabal Khandamah project, Makkah City, Jadwa Company, 2015.
  17. Stability analysis and assessment of slope cuts (Man – made) at Maad International Company project, Almesfalah area, Makkah City,2017.
  18. Supervision of rock slope cuts support implementation works at Maad International Company project, Almesfalah area, Makkah City,2018
  19. Consultation study to evaluate the possibility of Rock cuts failures along Road # 6 , Thakher Development Ltd Co., Alsaydah Mountain, Almabidah, Makkah City. (2020).
  20. The engineering geological consultation study to determine the method of implementing rock cutting works for the project to complete the Third Ring Road from the Grand Mosque Road in Al-Aziziyah to Sidqi Street in Mina, Makkah Al-Mukarramah.
  21. Stability Analysis of rock cutting works, Plateau refining and preparation project at Muzdalifah and Mina Holy Shines,  Makkah city.
  22. Stability Analysis of rock masses and determining the method of implementing rock cutting works, Alrabitah project in Mina Holy Shrine, Makkah City.
  23. Consultation study for Stability Analysis of rock cutting works Third Ring Road Extension Alazizyah,  Makkah City.